Coastal Bend Regional Water Authority — live operations
Process, energy and compliance telemetry across 2 water treatment plants, 1 water reclamation facility and 22 lift stations.
+1.2 pts vs 7-day avg
Energy intensity, blower condition and treated flow
Aeration energy intensity has drifted 13.9% above target over seven weeks, tracking the Blower #2 bearing degradation curve almost exactly.
Assets driving the performance gap
Aeration Blower #2
Water Reclamation Facility · Aeration Basin 3
Bearing wear signature with compounding aeration energy penalty
$148,000 / yr energy impact if uncorrected · process risk to ammonia removal
LS-14 Wet Well Pump A
Collection Network · Lift Station 14 (Harbor Bend)
Early impeller wear — elevated vibration with declining flow vs baseline
$96,000 avoided SSO exposure · $18,400 avoided emergency pump replacement
Sodium Hypochlorite Day Tank
WTP-2 · Chlorine Feed
Fill level approaching replenishment threshold — PO auto-raised
$7,800 avoided expedited-delivery premium
UV Disinfection Bank 1
Water Reclamation Facility · Disinfection
Declining UV transmittance — sleeve fouling signature developing
$21,000 / yr lamp + energy waste · permit disinfection margin narrowing
Demo environment · values shown are realistic estimates, not audited financials